JP2089 PH2A reaches full operational capability

Defence Case Study - JP2089 Tactical Data Links

Shoal Group congratulate Pacific Aerospace Consulting (PAC) upon the announcement of Full Operational Capability (FOC) for JP2089 PH2A on 24 November.

PAC is the prime contractor supporting the JP2089 Phase 2A Initial Common Support Infrastructure (ICSI) for Tactical Data Links (TDL), delivered under the Multi-Tactical Data Link Network (MTN) Sub-Program. The ultimate goal of this program is to provide a common architecture to support data exchange across Joint Force assets, infrastructure, and command and control, in a timely manner. This involved the transition from the current state of multiple formats and limited interoperability, to the future state where data is created, processed and shared seamlessly.

Shoal worked together with PAC, providing systems engineering assistance to support design changes to the ICSI. As part of the announcement, PAC recognised the team from Shoal.

“We also acknowledge and show our gratitude to our MC2SPO and industry partner, Shoal Group. The continued investment in Australian Industry Capability (AIC) allowed PAC to feel empowered and further develop its capabilities throughout service delivery. It is only through trust and collaboration that this significant milestone was achieved.”

PAC’s full announcement can be read here.

To find out more about Shoal’s role in this project, read our case study.